Ready for Occupancy!!!!
Ready for Occupancy!!!!
Monday, August 17, 2009
Last Wednesday the outdoor carpet was to be installed on the concrete pad, both inside the POD and outside. Unfortunately, due to a communication error between two contractors, the installers didn't bring everything they needed. So they left the carpet for a later installation.
Last Thursday I was finally able to do another "leak check" to check whether I managed to seal the leaks that appeared following the initial set up. After that heavy rain on 25 July, it had not rained much since until the previous night. It appears that I did adequately seal those initial leaks. Unfortunately, this rain further delayed the carpet installation.
I noticed that I had a couple of air gaps at the bottom of the door. I sealed these before the carpet was installed.
Before:
After:
Today, the carpet was installed:
Now I can begin to move things to the POD! Almost ready to begin observations from my new observatory!!!!